close
Mobil Uygulamamızı ücretsiz indirin Anlık mesajlaşma özelliği ile Mesajlaşma şu an yayında, hemen kullanmaya başla!
search
Tüm Menü

Yapı ve İnşaat / Ürdün Alım Satım İş Birliği Nakliye İhale İlanları Ürdün için İhracatı İlanları, Ürdün İthalat ve İhracat

Yapı ve İnşaat / Ürdün İthalat İhracat Şirketleri Alım Teklifleri Ürdün İthalat İhracat Fırsatları

Ürdün'den Yapı ve İnşaat kategorisindeki ilanları görüntülüyorsunuz

We, ******** Company, would like to purchase the following products, provided that these products are Turkish made. Please provide us with the best price quote for any product you have from this list Required Equipment: - Electrical Drilling Machine. - Ring hammer wrench set for size range (6-55mm). - Set of Standard Hand Plumbing Tools.

We, ******** Company, would like to purchase the following products, provided that these products are Turkish made. Please provide us with the best price quote for any product you have from this list Required Equipment: - Electrical Drilling Machine. - Ring hammer wrench set for size range (6-55mm). - Set of Standard Hand Plumbing Tools.

Supply and installation of inlet CSV, buried gas pipes and gas pipes above ground, LFG interconnection with the existing Power Plant and the condensate removal network. Skid-mounted gas blower for 900 Nm3/h and pressure range -150 / +200 mbar. Necessary accessory elements. According to the attached RFP.

We are intending to start a project for building (300) houses each of which is 300 M2 as a first phase. Location : Iraq , about 120 Km West North of Baghdad, one KM only from a main river. House Details : • 3 and 4 bedrooms. • Two Stories. • A small garden. • Kitchen • Living room • Guest room • Two Toilets + Bath rooms. You are kindly requested to quote your best prices and best methods for achieving such a project , specifying : 1- Method for building 2- Items and materials which can be obtained locally and others which should be imported to the project. 3- Type of materials used in building and method of installing electricity lines and water piping. 4- Lead time for finishing one unit and number of workers. ( Skilled and Unskilled) 5- Durability …. Expected age of houses. 6- Any other specifications which make this type of building better than others. 7- Cost of each unit as per Turn-Key Project. Please do not hesitate to arise any question or suggestion concerning this project.

Please advise if this is of interest to you and advise the contact's details to send the inquiry documents.

We are interested in the Electrical and Automation Installation Works at SUES and SDES of Intake Project in Arab Potash Company, the deadline to submit the offers is 9 May 2021. Please provide us with your offers ASAP to give the contractor times to work on it. Waiting for your offers.

Ürdünde satmak için elektrik katlanabilir tenteler almak istiyoruz.

  • 1
  • 2
  • Next Page
Destek Başa Dön